Customization: | Available |
---|---|
Estimated Tare Weigh: | 13360kg |
Payload: | 26640kg |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Tanker Essential Information | ||
Dimensions(length*width*height) | (13000×2500×3620×14)mm | |
Estimated Tare Weigh (Curb Weight) | 13360kgs | |
Payload | 26640kgs | |
Total Weight | 40000kgs | |
Tank Volume | 29.6 m3 | |
Traction pin height from the ground | 1320mm | |
Shell Of Tanker | ||
Filling medium | Liquid Co2 | |
Fluid property | Liquid | |
Design temperature | ·-40ºC | |
Design pressure | 2.3MPa | |
Corrosion allowance | 1.0mm | |
Major materials of bearing pressure |
Tanker body :16MnDR , 12mm GB713 | |
End plate : 16MnDR , 14mm GB713 | ||
Main Beam : AG700 | ||
Shape | round | |
Compartments | Single | |
Filling weight per volume | 29.6m3 | |
Weld joint factor | 1.0 mm | |
Detection | ||
Pressure test | 2.65MPa | |
Gas-tight test pressure | 2.3MPa | |
control system | ||
Safety Valve | 2set ,DAY-25 2.45MPa | |
Low-temperature shut-off valve | 5sets DJS-50A | |
emergency shutoff valve | 2 sets QGJ43F-25-8 & QGJ43F-25-7 | |
Ball Valves | 2 sets Q41F-25P-9 & Q41F-25P-8 | |
liquidometer | 1set 0-2000mm MZC-A | |
indicating pressure gauge | 1 set YTN-100T 0-4.0MPa Accuracy 1.6 degree | |
Running System | ||
Axles | 13 TON FUWA Axles *3 unit | |
Tyre | Double Coin 12R22.5 * 12 pieces | |
Kingpin | 3.5", 90# bolt on ,in rubbing plate | |
Landing legs | FUWA 28T single linkage, Gear type * 2 piece | |
Pneumatic Brake System | ||
Spring brake chamber | FUWA brand * 6 pieces(4double+2single) | |
Air connector | FUWA brand * 2 pieces | |
Relay Valve | 1 pieces | |
ABS | ABS 1 pieces | |
Electronical System | ||
7-Pin Socket | 24V 7-pin socket one set | |
LED Lamp led | All kinds of lamp | |
Cable | Stander cable 1 set | |
Accessories | ||
Wheel carrier | 2 | |
Fire extinguisher | 2sets 8Gg | |
Cabinet | 1 | |
Steel fender | ||
Static conductive belt | Model C | |
Impeller blasting | ||
Small Tool box | 1 | |
Tools |
Spare wheel up-down regulator Spare tire crank Leg crank Tire socket spanne Shaft head socket spanner |
Packaging & Delivery:
Packaging Details: Naked, maxed before shippment
Delivery Detail: 25 days after diposit
Our tanker trailers production line :
Contact us :
Looking forward to your any consults !